![](https://milestoneco.us/wp-content/uploads/2020/09/Broomfield-Pic-1024x768.jpg)
Broomfield
Installation of approximately 14,225’ of 20-inch steel mainline pipeline. 11,682’ of .375wt X-65 Fusion Bond Epoxy (FBE) coated pipe and 2,543’ of .500wt X-65 Abrasion Resistant Overcoat (ARO) pipe. There are five identified Horizontal Directional Drillings (HDDs)/bores.