Front Range Facilities

Project consisted of six new pump stations, three pump station additions, and one meter station. Sites were located in Colorado, Texas, and Oklahoma. Milestone’s work consisted of mainline block valve (MLBV) fabrication, stopple support and piping tie-ins, and 500 LF Horizontal Directional Drilling (HDD) to connect meter station to facility. Complete site work included cut/fills,…

Read More

Cushing Meter Station

Milestone constructed a meter station including foundations, setting equipment (including meter, filter, and Remote Terminal Unit (RTU) building), pipe installation and hydrotesting, electrical and instrumentation, perimeter fence and gate installation, and fine grading and rock placement.  Milestone self-performed concrete foundations, pipe fabrication and installation of all piping, large equipment, and valves. A crane subcontractor was…

Read More

Stromberger Well Project

Milestone successfully installed approximately 4,068 LF of 6″ pipeline in Weld County, CO. This includes the fabrication and installation of two Pig Traps. One of our challenges with this project was the tie-in and fabrication on the west end of the job. The access was tight, and we had numerous existing utilities we had to…

Read More

Great Western Railway

Milestone Companies was under contract to install 6,400 LF of new rail in addition to installation of 105 LF cast-in-place box culvert and 20,000 CY of cut and rail. This design build project provided the added challenge of coordinating with the engineer on design plans, coordinating with the owner, and acquiring permits within a tight…

Read More