Front Range Facilities

Project consisted of six new pump stations, three pump station additions, and one meter station. Sites were located in Colorado, Texas, and Oklahoma. Milestone’s work consisted of mainline block valve (MLBV) fabrication, stopple support and piping tie-ins, and 500 LF Horizontal Directional Drilling (HDD) to connect meter station to facility. Complete site work included cut/fills, detention pond excavations, aggregate road installation, and concrete foundation installation. There was approximately 2,700 CY of concrete poured.