Stromberger Well Project
Milestone successfully installed approximately 4,068 LF of 6″ pipeline in Weld County, CO. This includes the fabrication and installation of two Pig Traps.
One of our challenges with this project was the tie-in and fabrication on the west end of the job. The access was tight, and we had numerous existing utilities we had to work around to complete the tie-in and set our fabrication.