20-inch Severance
Milestone installed 57,349 feet of trenched 20” pipe, 39 total HDD/bores containing 11,832 feet of directionally-drilled/bored 20” pipe, three pipeline futures, two automated launcher/receivers, and one mainline block valve setting in Weld County, CO.
This project had numerous challenges our team successfully worked through. One challenge consisted of completing 39 HDDs in 57,349 feet. This was 3.5 HDDs per mile which caused our team to work hard scheduling the bore crews ahead of tie-ins. The project also had a total of 202 PIs which is 18.6 PIs per mile.