Broomfield

Installation of approximately 14,225’ of 20-inch steel mainline pipeline. 11,682’ of .375wt X-65 Fusion Bond Epoxy (FBE) coated pipe and 2,543’ of .500wt X-65 Abrasion Resistant Overcoat (ARO) pipe. There are five identified Horizontal Directional Drillings (HDDs)/bores.

Read More

White Cliffs 1 NGL Conversion

Convert five pump stations from crude oil service to NGL service in Lindon, CO, Sharon Springs, KS, Laird, KS, Cunningham, KS, and Deer Creek, OK. All sites’ scope of work included demo of existing pumps and piping, installing concrete foundations and helical piles, fabricating and installing new valves and piping, setting and installing new equipment…

Read More

Cherry Hills South

Rehabilitation of 40 miles of the 18″ Cushing to Panova Line, beginning in Avery, OK and ending in Shawnee, OK. Major items of work included re-routing of 35,280 LF of pipeline, 7,214 LF of Horizontal Directional Drilling (HDD) bores, cutout and replace 147 anomalies, and fabrication/installation of new launcher/receiver, and six mainline block valve (MLBV)…

Read More

12-inch Freedom Pipeline

Milestone successfully constructed and installed approximately 24 miles of 12.75′ beginning at a Terminal in Weld County, CO, and terminating North East of Greeley, CO, at another Terminal in Weld County, CO. We completed 70 EA HDDs on this project. Milestone installed a launcher, receiver, and 4ea MLBV’s. Each above ground site was 30′ X…

Read More

12-inch Badger Pipeline

Milestone installed and constructed approximately 29 miles of 12.75’ beginning near Dacono, Colorado, and terminating at a Terminal in Weld County, Colorado. One major challenge on the Badger project was dealing with ground water and the South Platte HDD. We started the South Platte HDD in June and completed the bore in October. This was…

Read More

Burr 8 Lateral

Milestone installed 10,854 feet of 8″ welded steel pipe. Milestone’s main challenge on this project was the designed pipeline route. We completed a pre-job walk with the Construction Manager over the project to discuss potential re-route and access prior to mobilization. We were able to make some changes to the design and re-route the project…

Read More

20-inch Severance

Milestone installed 57,349 feet of trenched 20” pipe, 39 total HDD/bores containing 11,832 feet of directionally-drilled/bored 20” pipe, three pipeline futures, two automated launcher/receivers, and one mainline block valve setting in Weld County, CO.  This project had numerous challenges our team successfully worked through. One challenge consisted of completing 39 HDDs in 57,349 feet. This…

Read More

8-inch Confluence

This project included approximately 4 miles of 8″ steel pipe installation and 5 bores. An additional 1.5 miles of 20″ was installed during this project and was added to contract via change order Milestone worked in tight conditions on the North end of the project. We completed setting fabrication and a tie-in at a new…

Read More

Remington 8

Milestone Companies was under contract to install 3.5 miles of 8” steel pipe along E-470 in Colorado. This pipe lays in the same ditch where Milestone had another project which included the installation of a 20” gas pipeline. Because of this additional pipe in the mix, Milestone had to take extra precautions to ensure safety…

Read More

8” & 10” Riverdale to Sharp

Milestone Companies was under contract to install approximately 2 miles of an 8″ oil pipeline as well as a 10″ gas pipeline spanning from Riverdale to Sharp. The South Platte River was crossed in addition to both Brighton Road and Riverdale Road. One major challenge of this project was the HDD that spanned under the…